Divisions

Secure buildings

A secure building is decided during design, not at handover.

Dominant constraint
Security settled before the structure goes up
Drawing review on a secure-building site — editorial context image.

The problem

Reworking security after the fact bears no comparison with settling it on the drawings.

Cutting a slab for a route that was overlooked, altering circulation to create a restricted zone, or adding backup power after commissioning are paid for in works, in delay, and in degraded operation while the works proceed.

Responsibility compounds it. Four contractors, each compliant with its own contract, can still leave a defect at the interface between their packages — one no contractor answers for and the client ends up carrying.

Services

What we deliver

Studies and design
Brief, required security level, siting decisions, coordination with the client’s project team.
Construction
Structure, finishing and technical trades, under a single delivery lead.
Technical rooms
Server rooms, patch rooms, supervision positions: cooling, power, access control and detection.
Integrated technical packages
Power, low-voltage, security, networks and backup supply treated as one package rather than placed side by side.
Acceptance and commissioning
Testing, clearing of reservations, operating documentation, training of the site teams.

Environments

Where we operate

  • Government sites and administrations
  • Diplomatic missions
  • Industry, mining and energy
  • Public buildings under security constraints

Environments concerned

Consultations · Pre-qualifications · Partnerships

Let us discuss the actual scope.

Describe the site, the dominant constraint and the deadline. We will say what requires a preliminary study and what can be committed directly.