Business areas

Transport and logistics

A coordination system is judged on the day one link is missing.

The environment

The systems to be linked were never designed to talk to one another.

Coordination brings together public and private operators whose systems were built separately, at different times, with no intention of talking to one another. The work is therefore about interfaces and data consistency, not about rebuilding: what costs is not the nominal exchange but the exception cases, and the ability to reconcile two systems when they diverge.

Resilience is the second constraint, and it is particular to this environment. A route, a control point or an operator can become unavailable without notice. The arrangement must stay usable in that state, which means deciding in advance what keeps working in degraded mode, and having proven it.

The field finally imposes its own rules. Crossing points are scattered, sometimes badly connected, often exposed. A design validated on the position at head office rather than on the most constrained site discovers in the twelfth month what it would have seen in the first.

Dominant constraints

What this environment imposes

A dominant constraint governs architecture, partners, equipment and method more than any list of services does.

Transport and logistics

Dominant constraintResilience of routes and multi-party coordination

Coordination brings together public and private operators whose systems were never designed to communicate. The arrangement must stay usable when one link becomes unavailable.

Before committing

Questions to settle internally

An organisation that cannot answer these questions is not ready to launch the programme. Saying so is better than selling it a study.

  • Which systems must be linked, and which belong to third parties?
  • What must keep working when one link becomes unavailable?
  • How are two diverging systems reconciled, and by whom?
  • Which crossing points are the worst connected, and do they serve as the pilot site?
  • Who arbitrates anomalies in the data migrated from the existing systems?
  • Which team operates the arrangement once it is in service?

Consultations · Pre-qualifications · Partnerships

Let us discuss the actual case.

Describe the site, the dominant constraint and the deadline. We will say what requires a preliminary study and what can be committed directly.