Mining site — server room and backup power
Construction of a secure technical room and its power chain, on an isolated site with no reliable public grid.
- Weeks of measurement before sizing
- 4
- Load tests per year
- 12
Reference KP-2024-008
Projects
Each record describes a real engagement: the operating problem, the architecture chosen, the constraints encountered and the result obtained. Whether the client is named depends on the written authorisation we hold, never on the effect sought.

Construction of a secure technical room and its power chain, on an isolated site with no reliable public grid.
Reference KP-2024-008

Replacement of the core network and backup power at fourteen points of presence, with no commercial service outage.
Reference KP-2023-021

Complete overhaul of access control, video surveillance and backup power for a chancery in service.
Reference KP-2022-014

A single control room for six sites whose security systems did not talk to each other.
Reference KP-2025-002

Twenty-two branches linked to head office, with unified telephony, backup paths and common supervision.
Reference KP-2024-019

Digitisation of a public-facing service, designed to remain usable on unstable connections and outside the capital.
Reference KP-2023-005
No public project matches these criteria.
Our portfolio includes engagements that are not published. The corresponding material is shared with an identified organisation as part of a pre-qualification.
Disclosure rule
Four levels, declared in each record’s header and checked when the site is built. The level applied depends on the written authorisation we hold — not on what the record would gain by showing.
Disclosure rule
AAnonymised
On the site
No condition. The default level.
BSemi-named
On the site
The nature of the organisation is named, the entity is not.
CNamed
On the site
Requires written authorisation, whose reference is recorded.
DRestricted
In pre-qualification
The record exists. It is served at no public address.
Pre-qualification
Engagements not listed here belong to organisations for which public exposure is a risk. Their description, architectures and associated contractual documents are shared with an identified organisation once the enquiry has been qualified.
Consultations · Pre-qualifications · Partnerships
Describe your priority, its operating context and the intended outcome. We will route the enquiry to the right person.
Results
No result.Try a broader word: power, security, network, pre-qualification.
↑↓ Move↵ Open pageEsc CloseAll pages